Search results

  1. h7snk9

    Power Distribution Board

    These are the ESCs they have a 5A BEC
  2. h7snk9

    Power Distribution Board

    Hi thanks for reply. I have 4s lipo battery but had the 50A escs just in the back room from a while ago. The motors have a maximum current draw of around 10A. I have limited time to finish the project so was wondering if these specs would work with just soldering all 4 esc wires together Thanks !
  3. h7snk9

    Power Distribution Board

    Hi there, I have 4 50A escs that I am trying to wire up to the battery. I do not have a power distribution board but was wondering if it would be a working solution to bundle up the 4 leads from the escs together (both positive and negative) and connect those directly to battery?
Top